ICF schools deliver a unique combination of structural strength and construction efficiency. Exterior ICF walls deliver code-compliant drainage planes and air sealing. They save copious amounts of energy via continuous insulation, thermal mass and no thermal bridging. ICFs are also fire resistant and mold resistant. As if all that is not enough, ICFs minimize sound transmission as well.

The success of ICF schools is well-known. Some of Pennsylvania’s ICF schools date to more than a decade ago. In 2003, Clearview Elementary School in Hanover, PA, became the state’s very first ICF school. It achieved LEED Gold certification. Today, there are hundreds of ICF schools nationwide, with about a hundred of them in Texas alone. Kentucky was another early adopter. In fact, Crestwood Elementary School in Crestwood, KY, was an award winner. It was first runner-up in the ICF Builder 2009 Heavy Commercial category.

Why School Districts Choose ICF Construction

A variety of trends favor ICF school construction today. Safety concerns are as high as ever. Codes are more stringent. An era of lower interest rates makes it easier to finance upscale ICF construction.

Heightened demands for sustainability

Sustainability is now more than a consideration; it is an expectation.. All the stakeholders have a vested interest in environmentally sound construction. Everyone benefits, from students to taxpayers, and from educators to school board members.

Increased emphasis on safety amid turbulent weather

Once the school year is underway, districts can ill-afford storm damage. It risks the welfare of students and staff. Repairs and reconstruction impact the education of young minds. ICF construction is an insurance policy of sorts. It protects against forces that might otherwise shut down schools. Depending on the region, extreme winds, floods, hurricanes and tornadoes are all concerns.

The immediate safety of all students and staff is always the highest priority. Continued operations is also vitally important. ICF construction is a long-term investment in peace-of-mind for all stakeholders. Many kinds of natural disasters assault schools. Tornadoes, hurricanes, wildfires, earthquakes are all examples. ICF walls combine with fire-resistant doors, windows and vents to deliver a high degree of passive fire protection.

Insurers recognize the safety, strength and durability of ICF construction. Accordingly, school districts may save on insurance premiums. With long lasting ICF construction, such savings accrue for decades.

The need for super-strong school construction is more evident in an era of weather extremes. In 2013, a tornado in Moore, OK, collapsed a school wall, resulting in fatalities. In January 2020, an 80 mph microburst injured three at an elementary school in North Carolina. FEMA’s “Making Schools Safe From High Winds” is a comprehensive 150-page report on the topic.

Importance of energy savings

When it comes to ICF construction, a number of Kentucky public school districts were “early adopters.” Collectively, the top five ICF schools in the state save an estimated $1.37 million in annual energy costs.

Seventeen years after it opened, Hanover’s Clearview Elementary still delivers annual energy savings of about $18,000.

Sound attentuation

ICF walls typically enjoy STC ratings of 50 and higher. School architects are more free to place classrooms adjacent to louder parts of the school, like gyms and cafeterias. Classrooms, music rooms and school theaters all benefit from reduced sound transmission. At the same time, exterior ICF walls reduce distractions posed by arriving school buses, and busy playgrounds.

Longevity

The earliest ICF schools are approaching 20 years of age. As a result, there’s more data suggesting reduced maintenance costs. Industry analysts often calculate the longevity of ICF schools at a century or more. Longevity makes ICF construction more cost effective. These costs include everything from initial materials acquisition to end-of-life recycling.

Case Studies

ICF school construction is catching on across the country. Here are two examples. One is in Kentucky, the other is in Oregon.

Jennings Creek Elementary School - Bowling Green, KY

Jennings Creek Elementary is the recipient of a 2020 ICF Builder Award. The school was first runner-up in the heavy commercial category. It is one of more than a dozen ICF schools in Kentucky’s Warren County School District. Construction of the $18 million project took 68 weeks. Crews completed installation of 52,800 sq-ft of insulated formwork in 85 days.

The average energy use intensity of a school in the climate four zone is 73. At Jennings Creek, energy use intensity is just 15.5. This means annual energy costs are less than one-fourth that of a comparable non-ICF school. Thanks to the addition of a 327 Kw solar array, the school is a net zero energy (NZE) structure. In fact, the solar array generates energy rebates of $30,000 per year.

Hood River Middle School - Hood River, OR

A bus barn once stood on the site of today's Music & Science Building at Hood River Middle School. The project features R-25 ICF walls rising as high as 26 feet. The roof boasts an R-38 rating, and the insulation under the radiant slab at R-15.

Sophisticated use of both passive and active heating and cooling systems led to net-zero certification. For example, horizontal tubing 10 feet under the soccer field pre-warms or pre-cools water going to two heat pumps. These systems provide both radiant heating and cooling.

Learn More

SpecifyConcrete.org is a website of the Pennsylvania Aggregates and Concrete Association (PACA). For more information on the advantages of ICF school construction, please contact us today!

Recommended Articles

12513927 10154127998102958 4719328728095904235 o

February 22, 2024

Understanding Whole Life Carbon in the Concrete Industry

Proficient carbon calculations are increasingly important as “Buy Clean” legislation proliferates. New York and Colorado are among the states that now require carbon calcs for public projects. An estimated 40% of emissions are from the built environment. According to one estimate, the planet’s total building floor area will double by 2060. This makes the concrete industry a key player in the quest for net-zero emissions products and projects.

Concrete Curing full

February 15, 2024

California: Coal-fired Cement Plants to Net Zero by 2045

The Natural Resources Defense Council (NRDC) notes that cement production is “so carbon intensive that even though cement makes up less than 15% of concrete by weight, it accounts for 90% of concrete’s carbon footprint.” The use of fossil fuels to fire cement kilns is a key source of these carbon emissions.

Featured image

February 08, 2024

Toward Net Zero Concrete: Global Initiatives

In the quest for reduced greenhouse gas (GHG) emissions, everyone has a role to play. In the concrete industry, this includes everyone from manufacturers to contractors, and from trade associations to governments. Here is a review of some of the major initiatives impacting concrete’s sustainability.

Concrete construction building

February 01, 2024

Graphene-Infused Metakaolin for Stronger Concrete

Ordinary Portland cement (OPC) requires high-temperature calcination of limestone. It is possible to use various emissions-reducing pozzolans in concrete. Fly ash comes from coal-fired power plants. Ground granulated blast furnace slag (GGBFS) comes from steel mills. Another SCM is metakaolin derived from kaolin.

Adobe Stock 465164163

PACA's Online e-Learning Center

The program is delivered in one (1) module and it should take approximately 30 minutes to complete.  You will receive a certificate of completion once you pass the quiz. The bookmarking feature will allow you to leave the course and resume where you left off when you return.

The Pennsylvania Aggregates and Concrete Association (PACA) is the industry’s unified voice, representing more than 200 member companies across the state.